hit counter code

Making Boilers Better

Clarion Hotel Limerick(click here for full version)

‘  ‘Our first quarter analysis shows savings of circa 36%’’

Mallow Town Swimming Pool(click here for full version)

‘M2G has contributed to a 20% saving in oil costs which have freed up finances to be used in other areas of the complex’

Beechlawn House Hotel(click here for full version)

   ‘the actual reduction in energy consumption between the 12 months was 19.8%’

Fermoy Leisure Centre(click here for full version)

  ‘we have not had to conduct any setting, calibration or commissioning of the M2G control since installation (Feb 2003) and it has not required any repair or maintenance’

Facilities Manager(click here for full version)

   ‘M2G is making a large impact on the college’s utility bill with no reports of under cooling or discomfort from staff or students’

Calor Gas Nothern Ireland (Technical Director, Click here for full version)

‘the actual savings produced from the 100 customer base test since installation of M2G varied from site to site obviously depending on system design or circumstances of use but was generally between 15% and 30%’

Building Services(click here for full version)

‘We further believe that the reduced running time achieved by the installation of the M2G software will increase the life span of our heating system thus deferring replacement costs’

 Hospital Case Study(click here for full version)

“The reduction in energy is certainly a major benefit with the M2G system but less energy consumption means less boiler activity which in turn has a number of other benefits. A reduction in electricity due to the fact there is less burner motor activity and more importantly, if the burner functions less, both it and the boiler should last longer which delays capital investment for boiler replacement.’

Testimonial Summary